MN DOT 511 Traveler Information
Winter Road Conditions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Winter Driving—Statewide
Map of Winter Driving—Statewide Between MN 32; US 59 and 150th Avenue Northeast (near Thief River Falls). The road is closed. A detour is in operation. The road is being repaved. Expect delays. There is a width limit in effect. There is a length limit in effect. There is a weight limit in effect. Width limit 11'0". Vehicle length limit 120 ft. Axle weight limit 20,000 lbs. Until August 20, 2018 at about 6:00PM CDT. Between 75th St NE (4 miles north of the Oronoco area) and MN 60 (Zumbro Falls). The road is closed due to road construction work and because the road is being repaved. A detour is in operation. Until August 24, 2018 at about 8:00PM CDT. Between 245th Street and 260th Street (13 to 15 miles west of the Clarkfield area). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 26, 2018 at about 9:00PM CDT. Between MN 15 and MN 15; County Road 21 (New Ulm). The road is closed because of construction work. A detour is in operation. Until October 18, 2018 at about 1:00PM CDT. Between 350th Avenue and County Road 47 (2 to 4 miles east of the Lastrup area). The bridge is closed. The route is closed to through traffic. Bridge construction work is in progress. A detour is in operation. Until August 31, 2018 at about 7:00PM CDT. Between MN 22; 2nd Avenue Northwest (Wells) and I-90 (Alden). The road is closed due to road construction work. A detour is in operation. Until August 3, 2018 at about 1:00PM CDT. Between US 14 (Eyota) and County Road 2 Northeast (near Elgin). The road is closed due to road construction work. A detour is in operation. Until August 15, 2018 at about 8:00PM CDT. Between 220th Avenue (New Richland) and US 14 (near Waseca). The road is closed. The bridge is closed. The road is being repaved. A detour is in operation. Short delays are possible. Until July 27, 2018 at about 8:00PM CDT. Between US 2 and County Highway 19 (10 miles north of the Crookston area). The road is closed. The road is being repaved. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until July 27, 2018 at about 6:00PM CDT. Between Division Street East (near Buffalo) and Autumn Oaks Drive (Rockford). The road is closed. A detour is in operation. The road is being repaved. From 7:00AM CDT to 5:00PM CDT daily. Until September 19, 2018 at about 10:30AM CDT. Between County Highway 6 (6 miles west of the Wheaton area) and Front Street North (Wheaton). The road is closed. Major road construction work is in progress. A detour is in operation. Until September 30, 2018 at about 10:00PM CDT. Between T-80 (2 miles north of the Mapleton area) and Hoffman Road (near Mankato). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 10'0". Until September 21, 2018 at about 1:00PM CDT. Between Kieffer Street Southwest (Watertown) and US 12; Buffalo Avenue South (Montrose). The road is closed. A detour is in operation. Work on underground services is in progress. The road is being repaved. From 7:00AM CDT to 5:00PM CDT daily. Until August 15, 2018 at about 10:30AM CDT. Between Exit 178B: 6th Street Northeast and Exit 180A: Oakland Place Northeast (near Austin). There are alternating lane closures due to bridge construction work. From 6:00AM CDT to 7:00PM CDT on weekdays. Until today at about 11:59PM CDT. Between West Grant Street (Spring Valley) and US 52; Industrial Drive (Preston). There are alternating lane closures because a seal coat treatment has been applied. A pilot car is in operation. Look out for flaggers. Until today at about 8:00PM CDT. Between MN 29 (Deer Creek) and US 10 (near New York Mills). The road is closed. Major road construction work is in progress. A detour is in operation. Expect delays. Until September 28, 2018 at about 4:30PM CDT. Between County Highway 22 (Harmony) and Saint Paul Street Northwest (Preston). There are alternating lane closures because the road is being repaved. Look out for flaggers. Until July 30, 2018 at about 8:00PM CDT. Between Lion Avenue (Hancock) and US 59 (Morris). The bridge is closed. A detour is in operation. Until August 24, 2018 at about 8:00AM CDT. Between 40th Street South (near Afton) and 70th Street South (near Cottage Grove). The road is closed. The road is being reconstructed. A detour is in operation. Until September 7, 2018 at about 5:00PM CDT. Between West George Street and West Goodrich Avenue (near Saint Paul). The bridge is closed. Bridge construction work is in progress. Until December 27, 2018 at about 5:00PM CDT. Between 1st Street Northwest and 1st Street Northeast (Glenwood). The road is closed. Major road construction work is in progress. A detour is in operation. Truck restrictions are in force. There is a width limit in effect. Width limit 12'0". Until July 31, 2018 at about 4:30PM CDT. Between Morlock Drive (Jordan) and MN 13 (near Prior Lake). There are alternating lane closures. The roadway is reduced to one lane. The left lane is closed. The right lane is closed. Look out for flaggers. Road construction work is in progress. From 9:00AM CDT to 3:00PM CDT on weekdays. Until today at about 3:00PM CDT. Between Credit River Road Southeast (Prior Lake) and MN 901B (Savage). There are alternating lane closures. Look out for flaggers. Night time construction work is in progress. From 6:00PM CDT to 6:00AM CDT on weekdays and Saturday. Until tomorrow at about 6:00AM CDT. Between MN 23 (near Spicer) and MN 9 (near New London). The road is closed. The road is being repaved. A detour is in operation. Until September 1, 2018 at about 8:00PM CDT. Between Hundertmark Road and Pioneer Trail (Chaska). The road is closed. Follow the detour signs. Major road construction work is in progress. Until September 3, 2018 at about 5:00PM CDT. Between County Road 19 (9 miles north of the Grand Rapids area) and County Road 262 (8 miles south of the Bigfork area). The road is closed to traffic. Major road construction work is in progress. Follow the detour signs. Until October 1, 2018 at about 2:00PM CDT. Between Ball Park and Cartway Drive (Lake Henry). The road is closed. A detour is in operation. The road is being repaved. Until September 19, 2018 at about 10:30AM CDT. Between Joseph Street and MN 210; North 6th Street (Brainerd). The road is closed. Major road construction work is in progress. A detour is in operation. Consider using an alternate route. Until September 28, 2018 at about 7:00PM CDT. Between 220th Avenue (Kasson) and Crossroads Dr SW (Rochester). Driving conditions are normal.
MN 1 in both directions: Road closed, detour in operation, paving operations, delays, width limit in effect, length limit in effect, gross weight limit in effect.
US 63 in both directions: Road closed, due to road construction work, because the road is being repaved, detour in operation.
MN 4 in both directions: Road closed, due to road construction work, detour in operation, width limit in effect, length limit in effect, gross weight limit in effect.
MN 60 in both directions: Road closed to all traffic except emergency vehicles, due to a crash involving a semi trailer.
MN 67 in both directions: Bridge closed, bridge construction, detour in operation.
US 14 in both directions: Road closed, because of construction work, detour in operation.
MN 27 in both directions: Bridge closed, no through traffic, bridge construction, detour in operation.
MN 109 in both directions: Road closed, due to road construction work, detour in operation.
MN 42: Road closed, due to road construction work, detour in operation.
MN 13 in both directions: Road closed, bridge closed, paving operations, detour in operation, short delays.
US 75 in both directions: Road closed, paving operations, detour in operation, width limit in effect.
MN 55 in both directions: Road closed, detour in operation, paving operations.
MN 27 in both directions: Road closed, major road construction, detour in operation.
MN 22 in both directions: Road closed, due to road construction work, detour in operation, width limit in effect.
MN 37: Bridge closed, width limit in effect, length limit in effect, follow the detour signs.
MN 25 in both directions: Road closed, detour in operation, work on underground services, paving operations.
I-90 in both directions: Alternating lane closures, due to bridge construction work.
MN 16 in both directions: Alternating lane closures, because a seal coat treatment has been applied, pilot car in operation, look out for flaggers.
MN 106 in both directions: Road closed, major road construction, detour in operation, delays.
MN 92 in both directions: Road closed, paving operations, detour in operation.
US 52 in both directions: Alternating lane closures, because the road is being repaved, look out for flaggers.
MN 9 in both directions: Bridge closed, detour in operation.
MN 95 in both directions: Road closed, road reconstruction, detour in operation.
MN 149 in both directions: Bridge closed, bridge construction.
MN 60: Bridge closed, because of construction work, detour in operation, width limit in effect, gross weight limit in effect.
MN 104 in both directions: Road closed, major road construction, detour in operation, width limit in effect.
MN 28 in both directions: Road closed, major road construction, detour in operation, truck restrictions in force, width limit in effect.
MN 282 in both directions: Alternating lane closures, roadway reduced to one lane, left lane closed, right lane closed, look out for flaggers, road construction.
MN 13 in both directions: Alternating lane closures, look out for flaggers, night time construction work.
MN 29 in both directions: Road closed, major road construction, detour in operation, width limit in effect.
US 71 in both directions: Road closed, paving operations, detour in operation.
MN 4 in both directions: Road closed, due to road work, width limit in effect, axle load limit in effect.
MN 41 in both directions: Road closed, follow the detour signs, major road construction.
MN 38 in both directions: Road closed to traffic, major road construction, follow the detour signs.
MN 4 in both directions: Road closed, detour in operation, paving operations.
MN 371B in both directions: Road closed, major road construction, detour in operation, consider using an alternate route.
Google Static Map Image
DOT Reports Closure