MN DOT 511 Traveler Information
Winter Road Conditions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Winter Driving—Statewide
Map of Winter Driving—Statewide Between MN 32; US 59 and 150th Avenue Northeast (near Thief River Falls). The road is closed. A detour is in operation. The road is being repaved. Expect delays. There is a width limit in effect. There is a length limit in effect. There is a weight limit in effect. Width limit 11'0". Vehicle length limit 120 ft. Axle weight limit 20,000 lbs. Until August 20, 2018 at about 6:00PM CDT. Between 75th St NE (4 miles north of the Oronoco area) and MN 60 (Zumbro Falls). The road is closed due to road construction work and because the road is being repaved. A detour is in operation. Until August 24, 2018 at about 8:00PM CDT. Between MN 15 and MN 15; County Road 21 (New Ulm). The road is closed because of construction work. A detour is in operation. Until October 18, 2018 at about 1:00PM CDT. Between MN 22; 2nd Avenue Northwest (Wells) and I-90 (Alden). The road is closed due to road construction work. A detour is in operation. Until August 3, 2018 at about 1:00PM CDT. Between US 14 (Eyota) and County Road 2 Northeast (near Elgin). The road is closed due to road construction work. A detour is in operation. Until July 13, 2018 at about 8:00PM CDT. Between 220th Avenue (New Richland) and US 14 (near Waseca). The road is closed. The bridge is closed. The road is being repaved. A detour is in operation. Short delays are possible. Until July 27, 2018 at about 8:00PM CDT. Between US 2 and County Highway 19 (10 miles north of the Crookston area). The road is closed. The road is being repaved. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until July 27, 2018 at about 6:00PM CDT. Between T-80 (2 miles north of the Mapleton area) and Hoffman Road (near Mankato). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 10'0". Until September 21, 2018 at about 1:00PM CDT. Between County Road 30 Southwest and US 12; Buffalo Avenue South (near Montrose). The road is closed. A detour is in operation. Work on underground services is in progress. The road is being repaved. From 7:00AM CDT to 5:00PM CDT daily. Until August 15, 2018 at about 10:30AM CDT. Between 2nd Avenue Northwest and MN 104; MN 29 (near Glenwood). The road is closed. Major road construction work is in progress. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until July 2, 2018 at about 4:30PM CDT. Between West Lyon Street and West Marshall Street (Marshall). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until June 30, 2018 at about 8:00PM CDT. Between County Highway 22 (Harmony) and Saint Paul Street Northwest (Preston). There are alternating lane closures because the road is being repaved. Look out for flaggers. Until July 30, 2018 at about 8:00PM CDT. Between Lion Avenue (Hancock) and US 59 (Morris). The bridge is closed. A detour is in operation. Until August 24, 2018 at about 8:00AM CDT. Between 40th Street South (near Afton) and 70th Street South (near Cottage Grove). The road is closed. The road is being reconstructed. A detour is in operation. Until September 7, 2018 at about 5:00PM CDT. Between West George Street and West Goodrich Avenue (near Saint Paul). The bridge is closed. Bridge construction work is in progress. Until December 27, 2018 at about 5:00PM CDT. Between MN 23 (near Spicer) and MN 9 (near New London). The road is closed. The road is being repaved. A detour is in operation. Until September 1, 2018 at about 8:00PM CDT. Between County Highway 8 and County Highway 1 (4 to 6 miles west of the Wrenshall area). The bridge is closed due to storm damage. A detour is in operation. Between Hundertmark Road and Pioneer Trail (Chaska). The road is closed. Follow the detour signs. Major road construction work is in progress. Until September 3, 2018 at about 5:00PM CDT. Between County Road 19 (9 miles north of the Grand Rapids area) and County Road 262 (8 miles south of the Bigfork area). The road is closed to traffic. Major road construction work is in progress. Follow the detour signs. Until October 1, 2018 at about 2:00PM CDT. Between Ball Park and Cartway Drive (Lake Henry). The road is closed. A detour is in operation. The road is being repaved. Until September 19, 2018 at about 10:30AM CDT. Between Nelson Street East (Stillwater) and MN 36 (Oak Park Heights). The road is closed due to road construction work. Follow the detour signs. Until July 2, 2018 at about 7:00PM CDT. Between Joseph Street and MN 210; North 6th Street (Brainerd). The road is closed. Major road construction work is in progress. A detour is in operation. Consider using an alternate route. Until September 28, 2018 at about 7:00PM CDT.
MN 1 in both directions: Road closed, detour in operation, paving operations, delays, width limit in effect, length limit in effect, gross weight limit in effect.
US 63 in both directions: Road closed, due to road construction work, because the road is being repaved, detour in operation.
US 14 in both directions: Road closed, because of construction work, detour in operation.
MN 109 in both directions: Road closed, due to road construction work, detour in operation.
MN 42: Road closed, due to road construction work, detour in operation.
MN 13 in both directions: Road closed, bridge closed, paving operations, detour in operation, short delays.
US 75 in both directions: Road closed, paving operations, detour in operation, width limit in effect.
US 71 in both directions: Road closed, road construction, detour in operation, follow the detour signs, width limit in effect.
MN 37: Bridge closed, width limit in effect, length limit in effect, follow the detour signs.
MN 22 in both directions: Road closed, due to road construction work, detour in operation, width limit in effect.
MN 25 in both directions: Road closed, detour in operation, work on underground services, paving operations.
MN 28 in both directions: Road closed, major road construction, detour in operation, width limit in effect.
MN 92 in both directions: Road closed, paving operations, detour in operation.
MN 19 in both directions: Bridge closed, bridge construction, detour in operation.
US 52 in both directions: Alternating lane closures, because the road is being repaved, look out for flaggers.
MN 9 in both directions: Bridge closed, detour in operation.
MN 95 in both directions: Road closed, road reconstruction, detour in operation.
MN 149 in both directions: Bridge closed, bridge construction.
US 71 in both directions: Road closed, paving operations, detour in operation.
MN 23 in both directions: Bridge closed, due to storm damage, detour in operation.
MN 95 in both directions: Road closed, utility work, detour in operation.
MN 68 in both directions: Bridge closed, bridge construction, detour in operation.
MN 4 in both directions: Road closed, due to road work, width limit in effect, axle load limit in effect.
MN 41 in both directions: Road closed, follow the detour signs, major road construction.
MN 38 in both directions: Road closed to traffic, major road construction, follow the detour signs.
MN 4 in both directions: Road closed, detour in operation, paving operations.
MN 95 in both directions: Road closed, due to road construction work, follow the detour signs.
MN 371B in both directions: Road closed, major road construction, detour in operation, consider using an alternate route.
Google Static Map Image
DOT Reports Closure