MN DOT 511 Traveler Information
Winter Driving—Southwest MN
Map of Winter Driving—Southwest MN Between North German Street and MN 15; County Road 21 (New Ulm). The road is closed because of construction work. A detour is in operation. Until November 1, 2019 at about 2:00PM CDT. Between 120th Street and 160th Street (1 to 4 miles west of the Canby area). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 1, 2019 at about 8:00PM CDT. Between County Road 13 and MN 68; Vernon Avenue (near Morgan). The road is closed to traffic. Road construction work is in progress. A detour is in operation. Drive with extreme caution. Until September 13, 2019 at about 5:00PM CDT. Between County Road 13 and Somerville Avenue (near Morgan). The road is closed to traffic. Road construction work is in progress. A detour is in operation. Drive with extreme caution. Until September 13, 2019 at about 5:00PM CDT. Between US 14; County Road 21 and 418th Lane (near New Ulm). The road is closed. Look out for construction work. A detour is in operation. Until tomorrow at about 5:00PM CDT. Between County Road B1 and 600th Street (1 to 2 miles east of the Granite Falls area). The road is closed. The road surface has collapsed. Follow the detour signs. Until July 30, 2020 at about 6:00PM CDT. Between County Highway 33 and 190th Avenue Northwest (near Milan). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until November 15, 2019 at about 8:00PM CDT. Between MN 23 and MN 55 (near Paynesville). The road is closed. The bridge is closed. Bridge construction work is in progress. A detour is in operation. Look out for flaggers. A pilot car is in operation. There is a weight limit in effect. Axle weight limit 8,000 lbs. Until August 30, 2019 at about 7:00PM CDT. Between 67th Street Southwest (near Pennock) and 30th Street Southwest (Willmar). The road is closed to traffic. Bridge construction work is in progress. Road construction work is in progress. A detour is in operation. Until June 30, 2020 at about 8:00PM CDT. Between MN 55 (near Paynesville) and I-94; County Road 65 (near Melrose). The road is closed. Look out for construction work. A pilot car is in operation. Look out for flaggers. A detour is in operation. Consider using an alternate route. Until October 10, 2019 at about 7:00PM CDT.
US 14 in both directions: Road closed, because of construction work, detour in operation, see map for detour(s).
MN 68 in both directions: Bridge closed, bridge construction, detour in operation, see map for detour(s).
MN 67 eastbound: Road closed to traffic, road construction, detour in operation, drive with extreme caution, see map for detour(s).
MN 68 in both directions: Road closed to traffic, road construction, detour in operation, drive with extreme caution, see map for detour(s).
MN 15 in both directions: Road closed, construction work, detour in operation, see map for detour(s).
MN 67 in both directions: Road closed, road surface collapse, follow the detour signs, see map for detour(s).
MN 40 in both directions: Bridge closed, bridge construction, detour in operation, see map for detour(s).
MN 4 in both directions: Road closed, bridge closed, bridge construction, detour in operation, look out for flaggers, pilot car in operation, gross weight limit in effect, see map for detour(s).
MN 40 in both directions: Road closed to traffic, bridge construction, road construction, detour in operation, see map for detour(s).
MN 4 in both directions: Road closed, construction work, pilot car in operation, look out for flaggers, detour in operation, consider using an alternate route, see map for detour(s).
Google Static Map Image
DOT Reports Closure