MN DOT 511 Traveler Information
Ended Event:
US 59 in both directions: Road closed.
Between MN 119; MN 7 (Appleton) and US 12 (near Holloway). The road is closed due to road construction work. There is a width limit in effect. Width limit 12'0". Until June 30, 2017 at about 7:00PM CDT.

Web Comment: Road closed for bridge work starting 5/30 for up to two weeks. Detour to Hwy 12 and Hwy 119. No OSOW restrictions on Detour. Resurfacing begins 6/5. 12' Width restriction begins 6/5
Last updated on June 5
US 59 in both directions: Road closed.
Map of US 59 in both directions: Road closed.
Zoom In
Zoom Out
Expired: (US 59 in both directions: Road closed, due to road construction work, width limit in effect.)
Google Static Map Image
DOT Reports Closure
Normal