MN DOT 511 Traveler Information
MN 32: Alternating lane closures, paving operations, short delays, pilot car in operation.
MN 32: Alternating lane closures.
Between MN 102 (Fertile) and Main Street (Saint Hilaire). There are alternating lane closures. The road is being repaved. Short delays are possible. A pilot car is in operation. Speed limit 40 MPH. Until June 30, 2017 at about 6:00PM CDT.

Web Comment: This is between Fertile, MN and St. Hilaire MN. Seal Coating the highway.
Last updated on June 6
MN 32: Alternating lane closures.
Map of MN 32: Alternating lane closures.
Zoom In
Zoom Out
Google Static Map Image
DOT Reports Closure
Normal