MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Truck Restrictions—Statewide
Map of Statewide Between County Road 89 and Mineral Center Road (27 to 30 miles east of the Grand Marais area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. A pilot car is in operation. Width limit 8'6". Until October 6, 2020 at about 2:00PM CDT.
MN 60 in both directions: Permitted oversize loads are prohibited, roadway reduced to two lane, because of bridge maintenance work, narrow lane, width limit in effect. Width limit 11'0".
MN 61: Roadway reduced to one lane, width limit in effect, road construction, pilot car in operation. Width limit 8'6".
US 169 in both directions: Gross weight limit in effect. No vehicles over 80,000.00 lbs.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit