Map of Statewide Between Exit 195: Wright County Road 75 (near Albertville) and Exit 205: MN 241 (near Rogers). The roadway is reduced to one lane. Night time construction work is in progress. The road is being repaved. Look out for flaggers. Short delays are possible. From 7:00PM CST to 7:00AM CST on weekdays. Until December 1, 2019 at about 7:00AM CST. Between Exit 266: Winona County Road 12 (1 mile west of the Dakota area) and Exit 229: Olmsted County Road 10 (Saint Charles). The roadway is reduced to one lane due to road construction work and due to bridge construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 60.00 MPH. Until Friday, at about 5:00PM CST. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. There is a width limit in effect. Width limit 11'0". Until Thursday, at about 11:45PM CST. Between MN 36 (Lauderdale) and Exit 29: Ramsey County Road I (Mounds View). The roadway is reduced to one lane. Night time construction work is in progress. There is a width limit in effect. Width limit 11'0". From 8:00PM CST to 5:00AM CST on Tuesday and Wednesday. Until Thursday, at about 5:00AM CST. Between North Dakota State Line and MN 220. Look out for flooding. The road is closed. Until Friday, at about 6:00PM CST. Between Exit 58: I-694; I-94 (near Oakdale) and Exit 59: Valley Creek Road (near Woodbury). The roadway is reduced to two lanes. Major road construction work is in progress. Until Friday, at about 6:00PM CST. Between Exit 24: Ramsey County Road C (Saint Anthony) and US 910A (Arden Hills). The right lane is closed. Look out for construction work. There is a width limit in effect. Width limit 11'0". Until Thursday, at about 5:00PM CST. Between Exit 216: I-494 (Maple Grove) and Exit 205: MN 241 (near Rogers). The roadway is reduced to one lane because of night time construction work. From 7:00PM CST to 12:00PM CST daily. Until November 27, 2019 at about 12:00PM CST. Between 320th Street Northwest and MN 11; County Road 7 (6 to 22 miles north of the Oslo area). The road is closed to traffic. Bridge construction work is in progress. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is a weight limit in effect. Width limit 14'0". Vehicle length limit 100.00 ft. No vehicles over 20,000.00 lbs. Until June 1, 2020 at about 7:00PM CST. Between MN 1; 490th Avenue Northwest and 330th Street Northwest (7 miles north of the Oslo area). The road is closed to traffic because of flooding. Until Friday, at about 6:00PM CST. Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). Night time construction work is in progress. Look out for flaggers. Expect delays. There is a width limit in effect. Width limit 12'0". Until November 29, 2019 at about 11:00PM CST. Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until Friday, at about 12:00PM CST. Between Loop Road and Gate 11 Road (4 miles east of the Two Harbors area). The roadway is reduced to one lane. There is a width limit in effect. Look out for temporary traffic lights. Observe the signals. Width limit 12'0". Until December 12, 2019 at about 5:00PM CST.
I-35W northbound: Roadway reduced to one lane, night time construction work, width limit in effect. Width limit 11'0".
MN 317: Flooding, road closed.
I-90 westbound: Roadway reduced to one lane, due to road construction work, due to bridge construction work, width limit in effect, speed restrictions in force. Width limit 14'0". Speed limit 60.00 MPH.
I-35W southbound: Roadway reduced to two lane, night time construction work, width limit in effect. Width limit 11'0".
I-35W northbound: Right lane closed, construction work, width limit in effect. Width limit 11'0".
MN 23: Roadway reduced to two lane, width limit in effect, speed restrictions in force, long term road construction. Width limit 12'0". Speed limit 30.00 MPH.
US 169 in both directions: Gross weight limit in effect. No vehicles over 80,000.00 lbs.
MN 220 in both directions: Road closed to traffic, bridge construction, detour in operation, width limit in effect, length limit in effect, gross weight limit in effect, see map for detour(s). Width limit 14'0". Vehicle length limit 100.00 ft. No vehicles over 20,000.00 lbs.
MN 220 in both directions: Road closed to traffic, because of flooding.
I-94 in both directions: Night time construction work, look out for flagger, delay, width limit in effect. Width limit 12'0".
MN 60 in both directions: Permitted oversize loads are prohibited, roadway reduced to two lane, because of bridge maintenance work, width limit in effect. Width limit 11'0".
MN 61: Roadway reduced to one lane, width limit in effect, temporary traffic light, observe signal. Width limit 12'0".
MN 72 in both directions: Gross weight limit in effect, bridge construction. No vehicles over 80,000.00 lbs.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit