MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Truck Restrictions—Statewide
Map of Statewide Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT. Between Washington Avenue (Minneapolis) and Exit 18: University Avenue (near Lauderdale). The roadway is reduced to two lanes. Night time construction work is in progress. From 10:00PM CDT to 5:00AM CDT on weekdays and Saturday. For a week. Between Exit 30: US 10 (Mounds View) and Exit 25: Ramsey County Road 88 (New Brighton). The roadway is reduced to one lane because of construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Until September 2, 2021 at about 6:00AM CDT.
MN 60 in both directions: Permitted oversize loads are prohibited, roadway reduced to two lane, because of bridge maintenance work, narrow lane, width limit in effect. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit