MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Truck Restrictions—Statewide
Map of Statewide Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT. Between Laurie Lane and Jonathan Carver Parkway (near Carver). Road construction work is in progress. There is a width limit in effect. Look out for flaggers. Width limit 11'0". Until October 31, 2021 at about 3:00PM CDT.
US 212 in both directions: Road construction, width limit in effect, look out for flagger. Width limit 11'0".
I-94 eastbound: Construction work, width limit in effect. Width limit 11'0".
MN 83 in both directions: Roundabout, width limit in effect, length limit in effect. Width limit 16'0". Vehicle length limit 110 ft.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit