MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Truck Restrictions—Statewide
Map of Statewide Between Exit 207: MN 101; Main Street (Rogers) and MN 610 (near Maple Grove). The roadway is reduced to one lane. Bridge construction work is in progress. From 9:00PM CDT to 5:00AM CDT on weekdays. Until Friday, at about 5:00AM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work. Between Laurie Lane and Jonathan Carver Parkway (near Carver). Road construction work is in progress. There is a width limit in effect. Look out for flaggers. Width limit 11'0". Until October 31, 2021 at about 3:00PM CDT.
MN 83 in both directions: Roundabout, width limit in effect, length limit in effect. Width limit 16'0". Vehicle length limit 110 ft.
MN 60 in both directions: Permitted oversize loads are prohibited, roadway reduced to two lane, because of bridge maintenance work, narrow lane, width limit in effect. Width limit 11'0".
US 212 in both directions: Road construction, width limit in effect, look out for flagger. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit