MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Truck Restrictions—Southwest MN
Map of Southwest MN Between Old River Bluff Road and MN 295; Freeman Drive (near Kasota). The roadway is reduced to one lane because of construction work. Until October 30, 2021 at about 6:00PM CDT. Between 2nd Avenue Northeast (Winnebago) and Kendall Street (Vernon Center). The roadway is reduced to one lane due to road construction work. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until November 3, 2021 at about 8:00PM CDT. Between Johnson Street and 135th Street (near Fairmont). Road construction. Drive with extreme caution. Look out for flaggers. Pilot car in operation. Starting Saturday at 7:00AM CDT until Saturday, at about 7:00PM CDT. Between County Road 17 and South Dakota State Line (1 mile north of the Hendricks area). The roadway is reduced to one lane. Road construction work is in progress. Look out for flaggers. A pilot car is in operation. Until Wednesday, at about 6:00PM CDT. Between County Road 27 (Sleepy Eye) and County Road 12 (near New Ulm). Road construction work is in progress. Drive with extreme caution. Look out for flaggers. A pilot car is in operation. Until today at about 7:00PM CDT. Between MN 4 (Fairfax) and MN 15 (Winthrop). Road maintenance work is in progress. There is work on the shoulder. Look out for flaggers. From 7:00AM CDT to 5:00PM CDT on weekdays. Until Wednesday, at about 5:00PM CDT. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until December 15, 2021 at about 6:00PM CDT. Between US 75 (Ortonville) and US 59 (near Holloway). The road is closed. Road construction work is in progress. A detour is in operation. Until November 6, 2021 at about 7:00PM CDT. Between MN 19; County Road 1 and County Road 17 (near Hendricks). The roadway is reduced to one lane. Road construction work is in progress. Look out for flaggers. Until Wednesday, at about 6:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
US 169: Roadway reduced to one lane, due to road construction work, look out for flagger, width limit in effect. Width limit 11'0".
I-90: Roadway reduced to one lane, due to road construction work, width limit in effect, speed restrictions in force. Width limit 11'0". Speed limit 60.00 MPH.
US 12 in both directions: Road closed, road construction, detour in operation, see map for detour(s).
MN 7: Height limit in effect. Height limit 14'1".
US 169 in both directions: Roundabout, width limit in effect, length limit in effect. Vehicle length limit 110 ft. Width limit 16'0".
MN 4: Roundabout, width limit in effect, length limit in effect. Width limit 16'0". Vehicle length limit 110 ft.
US 169 in both directions: Roundabout, width limit in effect, length limit in effect. Width limit 16'0". Vehicle length limit 110 ft.
US 169: Roundabout, width limit in effect, length limit in effect. Vehicle length limit 110 ft. Width limit 16'0".
US 75 in both directions: Gross weight limit in effect. No vehicles over 80,000 lbs.
MN 4: Roundabout, width limit in effect, length limit in effect. Width limit 14'6". Vehicle length limit 100 ft.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit