MN DOT 511 Traveler Information
We've been listening to you.Try phase 2 of our updated 511 website and leave us feedback!
Truck Restrictions
I-35 Whole Road 3 reports
Iowa to Owatonna No reports
Owatonna to 35E/35W split No reports
35E/35W split to Duluth 3 reports
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 131: Broadway (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Night time construction work is in progress. Between 40th Avenue West and Exit 254: 27th Avenue West (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. People are working in the median. Width limit 12'0". Until November 17, 2020 at about 2:00PM CDT. Between I-535; US 53 and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Short delays are possible. Width limit 12'0". Until November 17, 2020 at about 11:59PM CDT.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, road construction, work in the median. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, road construction, short delay. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit