MN DOT 511 Traveler Information
Truck Restrictions
I-94 Whole Road 3 reports
North Dakota to Alexandria 2 reports
Alexandria to St. Cloud 1 report
St. Cloud to Brooklyn Center 1 report
Brooklyn Center to Wisconsin No reports
Truck Restrictions on I-94
Map of Reports on I-94 Between the start of I-94 (Moorhead) and Exit 15: Clay County Road 10 (near Dilworth). The roadway is reduced to one lane. Road maintenance work is in progress. Night time construction work is in progress. Look out for flaggers. Until today at about 5:00AM CDT. Between Exit 1: US 75 and 20th Street (Moorhead). Bridge maintenance work is in progress. There are alternating lane closures. Night time construction work is in progress. Until today at about 5:00AM CDT. Between Exit 97: MN 114 (2 miles west of the Alexandria area) and Exit 103: MN 29 (near Alexandria). The roadway is reduced to one lane. The roadway is shared with opposing traffic. Major road construction work is in progress. Expect delays. There is a width limit in effect. Width limit 12'0". Until August 30, 2019 at about 6:00PM CDT. Between Exit 193: MN 25 and Exit 194: CR 18 (Monticello). Night time construction work is in progress. There are alternating lane closures. Until Friday, at about 10:00AM CDT. Between MN 120; Century Avenue (near Oakdale) and Exit 250: Radio Drive (near Woodbury). The left lane is closed. Road construction work is in progress. From 6:00AM CDT to 2:00PM CDT on Monday, Tuesday and Wednesday. Until tomorrow at about 2:00PM CDT.
I-94 in both directions: Bridge maintenance operation, alternating lane closure, night time construction work.
I-94 in both directions: Roadway reduced to one lane, opposing traffic sharing the roadway, major road construction, delay, width limit in effect. Width limit 12'0".
I-94 in both directions: Night time construction work, alternating lane closure.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit