I-35 Whole Road 4 reports
Iowa to Owatonna No reports
Owatonna to 35E/35W split No reports
35E/35W split to Duluth 4 reports
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 127: I-35E; I-35W and Exit 132: US 8 (near Forest Lake). Construction work. Alternating lane closures. Starting tomorrow at 7:00AM CDT until tomorrow at about 2:00PM CDT. Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until November 15, 2019 at about 12:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT. Between Exit 139: Chisago County Route 19 (Stacy) and Exit 132: US 8 (near Forest Lake). Construction work. Left lane closed. Starting tomorrow at 8:00AM CDT until tomorrow at about 5:00PM CDT. Between Pine County Road 117 and Exit 171: Pine County Road 11 (Pine City). The roadway is reduced to one lane. Bridge construction work is in progress. Observe the signs. Until today at about 11:00PM CDT.
I-35 northbound: Construction work, alternating lane closure.
I-35 southbound: Width limit in effect. Width limit 12'0".
I-35 southbound: Roadway reduced to two lane, major road construction, width limit in effect. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.