MN DOT 511 Traveler Information
Truck Restrictions
I-35 Whole Road 4 reports
Iowa to Owatonna No reports
Owatonna to 35E/35W split 1 report
35E/35W split to Duluth 3 reports
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 59: MN 21; Lyndale Avenue (Faribault) and Exit 76: Deuce Road (Elko New Market). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 7, 2019 at about 5:00PM CDT. Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until November 15, 2019 at about 12:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT. Between Exit 129: MN 97; Lake Drive (near Columbus) and Exit 132: US 8 (near Forest Lake). Look out for construction work. The right lane is closed. Until today at about 2:00PM CDT.
I-35 in both directions: Road construction, alternating lane closure, width limit in effect. Width limit 11'0".
I-35 southbound: Width limit in effect. Width limit 12'0".
I-35 southbound: Roadway reduced to two lane, major road construction, width limit in effect. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit