MN DOT 511 Traveler Information
We've been listening to you.Try phase 2 of our updated 511 website and leave us feedback!
Truck Restrictions
I-35 Whole Road 4 reports
Iowa to Owatonna No reports
Owatonna to 35E/35W split No reports
35E/35W split to Duluth 4 reports
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 131: Broadway (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Night time construction work is in progress. Between Exit 235: MN 210 (near Carlton) and Exit 237: MN 33 (near Scanlon). The roadway is reduced to one lane. There is a width limit in effect. Bridge inspection work is in progress. Width limit 12'0". Until tomorrow at about 4:00PM CDT. Between 40th Avenue West and Exit 254: 27th Avenue West (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Expect changing traffic patterns. Width limit 12'0". Until November 3, 2020 at about 2:00PM CDT. Between I-535; US 53 and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Short delays are possible. Width limit 12'0". Until November 17, 2020 at about 11:59PM CDT.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, bridge inspection work is in progre. Width limit 12'0".
I-35 in both directions: Roadway reduced to one lane, width limit in effect, road construction, changing traffic pattern. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, road construction, short delay. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit