MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions
I-35 Whole Road 2 reports
Iowa to Owatonna No reports
Owatonna to 35E/35W split 1 report
35E/35W split to Duluth 1 report
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 87: Crystal Lake Road and I-35E; I-35W (near Burnsville). Road closed. Bridge maintenance operations. Night time construction work. Starting today at 8:00PM CDT until tomorrow at about 5:00AM CDT. Between Exit 127: I-35E; I-35W (near Forest Lake) and Exit 165: MN 70 (near Rush City). Air quality is poor. For the next day. Between Exit 159: Rush Lake Road and the end of I-35. Air quality is poor. For the next day. Between Exit 159: Rush Lake Road and the end of I-35. Air quality is poor. For the next day. Between Exit 250: US 2 and Exit 249: Boundary Avenue (Proctor). The road is being repaved. Road construction work is in progress. At the rest area. Until September 14, 2021 at about 11:59PM CDT. Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT.
I-35 in both directions: Road closed, bridge maintenance operation, night time construction work.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work, changing traffic pattern. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit