MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
I-35: 35E/35W split to Duluth
I-35 in both directions: Roadway reduced to one lane, head to head traffic on the roadway, road construction, width limit in effect. Width limit 12'0".
Between Exit 152: Chisago County Road 10 (Harris) and Exit 165: MN 70 (near Rock Creek). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until June 18, 2020 at about 7:00PM CDT.

Web Comment: lanes will be alternating to SB I-35 due to concrete overlay on NB I-35
Last updated on April 16
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Between 21st Avenue West and Exit 254: 27th Avenue West (Duluth). There is a width limit in effect. There is a length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.

Web Comment: SB I- 35 to NB TH 53 ramp is restricted to 12'6" wide and 110' long.
Last updated on June 21
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-35: 35E/35W split to Duluth
Map of Reports on I-35 Between Exit 152: Chisago County Road 10 (Harris) and Exit 165: MN 70 (near Rock Creek). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until June 18, 2020 at about 7:00PM CDT.
I-35 in both directions: Roadway reduced to one lane, head to head traffic on the roadway, road construction, width limit in effect. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit