MN DOT 511 Traveler Information
We've been listening to you.Try phase 2 of our updated 511 website and leave us feedback!
I-35: 35E/35W split to Duluth
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work. Width limit 12'0".
Between 40th Avenue West and 21st Avenue West (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Width limit 12'0". Until April 30, 2021 at about 2:00PM CST.

Web Comment: I-35 in Duluth at the 27 Avenue West bridge daytime lane closures due to bridge reconstruction for the Twin Ports Interchange project. No restrictions on weeknights, weekends, and Holiday weekends. Loads wider than 12' can call for District approval. For more information and daily updates on this project Click Here
Last updated yesterday at 2:39pm CST
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Between 21st Avenue West and Exit 254: 27th Avenue West (Duluth). There is a width limit in effect. There is a length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.

Web Comment: SB I- 35 to NB TH 53 ramp is restricted to 12'6" wide and 110' long.
Last updated on June 21
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-35: 35E/35W split to Duluth
Map of Reports on I-35 Between 40th Avenue West and 21st Avenue West (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Width limit 12'0". Until April 30, 2021 at about 2:00PM CST.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit