MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-94: St. Cloud to Brooklyn Center
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-94: St. Cloud to Brooklyn Center
Map of Reports on I-94 Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes because of construction work. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work. Between Exit 207: MN 101; Main Street (Rogers) and Exit 216: I-494; I-694 (Maple Grove). The roadway is reduced to two lanes. Look out for construction work. From 9:00AM CST to 2:00PM CST on weekdays. Until tomorrow at about 2:00PM CST.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit