MN DOT 511 Traveler Information
Truck Restrictions on US 75
US 75
Between 4th Street Northeast and 7th Street Northeast (Pipestone). There is a weight limit in effect. No vehicles over 80,000.00 lbs.
Last updated on November 1
Between MN 27; 2nd Avenue South and 5th Avenue North (Wheaton). The road is being repaved. There are alternating lane closures. Look out for flaggers. Short delays are possible. From 7:00AM CDT to 7:00PM CDT daily. Until October 1, 2019 at about 7:00PM CDT.

Web Comment: No OSOW restrictions. No OSOW restrictions. For additional information on this project Click Here
Last updated on August 1
Between 150th Avenue (near Hendrum) and 245th Avenue (Halstad). The road is closed. Look out for construction work. The road is being repaved. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is a weight limit in effect. Consider using an alternate route. Vehicle length limit 100.00 ft. No vehicles over 20,000.00 lbs. Width limit 16'0". Until November 2, 2019 at about 7:00PM CDT.

Web Comment: For additional information on this project and detour information Click Here
Last updated on July 3