MN DOT 511 Traveler Information
US 63
US 63: Width limit in effect, due to road construction work. Width limit 12'0".
Between Potter Street and Wisconsin State Line (near Red Wing). There is a width limit in effect due to road construction work. Width limit 12'0". Until September 30, 2020 at about 5:00PM CST.

Web Comment: Width Limit is 12 feet.
Last updated on November 15
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 63
Map of Reports on US 63
US 63: Width limit in effect, due to road construction work. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit