MN DOT 511 Traveler Information
I-35
I-35 in both directions: Road construction, alternating lane closure, width limit in effect. Width limit 11'0".
Between Exit 59: MN 21; Lyndale Avenue (Faribault) and Exit 76: Deuce Road (Elko New Market). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 7, 2019 at about 5:00PM CDT.
Last updated on October 11
I-35 southbound: Width limit in effect. Width limit 12'0".
Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 11:59PM CDT.
Last updated on June 11
I-35 southbound: Roadway reduced to two lane, major road construction, width limit in effect. Width limit 12'0".
Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT.

Web Comment: Northbound width restriction of 12 feet. Expect non-peak lane closures. For project information:Click Here
Last updated on August 22
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Between 21st Avenue West and Exit 254: 27th Avenue West (Duluth). There is a width limit in effect. There is a length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.

Web Comment: SB I- 35 to NB TH 53 ramp is restricted to 12'6" wide and 110' long.
Last updated on June 21
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 59: MN 21; Lyndale Avenue (Faribault) and Exit 76: Deuce Road (Elko New Market). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 7, 2019 at about 5:00PM CDT. Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until November 15, 2019 at about 12:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT.
I-35 in both directions: Road construction, alternating lane closure, width limit in effect. Width limit 11'0".
I-35 southbound: Width limit in effect. Width limit 12'0".
I-35 southbound: Roadway reduced to two lane, major road construction, width limit in effect. Width limit 12'0".
I-35 southbound: Width limit in effect, length limit in effect. Width limit 12'6". Vehicle length limit 110.00 ft.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit