MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Truck Restrictions on MN 72
MN 72
Between US 71; Brandl Drive and MN 1 (6 miles north of the Blackduck area). The road is closed. The bridge is closed. A detour is in operation. Until October 3, 2020 at about 5:00PM CDT.
Last updated on August 3
Between Maple View Road Northeast and Artesian Spring Road Northeast (4 to 5 miles north of the Kelliher area). The roadway is reduced to one lane. Expect single line traffic alternating directions. Look out for flaggers. Bridge construction work is in progress. There is a width limit in effect. Width limit 10'0". Until October 3, 2020 at about 5:00PM CDT.
Last updated on August 3