MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
MN 55
MN 55 in both directions: Road closed, bridge construction, detour in operation, see map for detour(s).
Between US 59 (Barrett) and MN 27 (Hoffman). The road is closed. Bridge construction work is in progress. A detour is in operation. Until September 9, 2020 at about 7:00PM CDT.
Last updated today at 1:33pm CDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on MN 55
Map of Reports on MN 55 Between US 59 (Barrett) and MN 27 (Hoffman). The road is closed. Bridge construction work is in progress. A detour is in operation. Until September 9, 2020 at about 7:00PM CDT. Between Maple Avenue South and Cherry Avenue South (Annandale). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. Until tomorrow at about 12:00PM CDT.
MN 55 in both directions: Road closed, bridge construction, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit