MN DOT 511 Traveler Information
I-35W
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT.

Web Comment: For project information: Click Here
Last updated yesterday at 6:00pm CDT
I-35W southbound: Night time construction work, alternating lane closure, short delay.
Between MN 36 and Exit 18: University Avenue (near Lauderdale). Night time construction work is in progress. There are alternating lane closures. Short delays are possible. From 7:00PM CDT to 5:00AM CDT daily. Until Friday, at about 5:00AM CDT.

Web Comment: No OSOW restrictions
Last updated on May 17
I-35W northbound: Night time construction work, alternating lane closure, short delay, width limit in effect. Width limit 11'6".
Between MN 36 (Lauderdale) and Lake Drive (Lexington). Night time construction work is in progress. There are alternating lane closures. Short delays are possible. There is a width limit in effect. Width limit 11'6". Until Friday, at about 8:00AM CDT.
Last updated on May 17
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35W
Map of Reports on I-35W Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between 90th Street (Bloomington) and Exit 8: 82nd Street (Richfield). The exit ramp is closed. The right shoulder is closed. Until July 3, 2019 at about 9:00PM CDT. Between MN 36 and Exit 18: University Avenue (near Lauderdale). Night time construction work is in progress. There are alternating lane closures. Short delays are possible. From 7:00PM CDT to 5:00AM CDT daily. Until Friday, at about 5:00AM CDT. Between MN 36 (Lauderdale) and Lake Drive (Lexington). Night time construction work is in progress. There are alternating lane closures. Short delays are possible. There is a width limit in effect. Width limit 11'6". Until Friday, at about 8:00AM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and US 10 (Mounds View). The right lane is closed. Look out for construction work. Until November 14, 2019 at about 5:00PM CDT. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until November 14, 2019 at about 11:45PM CDT. Between Exit 36 (Circle Pines) and Lake Drive (Lexington). Look out for construction work. Expect changing traffic patterns. Until November 14, 2019 at about 11:45PM CDT. Between Exit 36 (near Lino Lakes) and I-35; I-35E (near Forest Lake). The roadway is reduced to one lane. Major road construction work is in progress. Until October 26, 2019 at about 10:00PM CDT.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
I-35W southbound: Night time construction work, alternating lane closure, short delay.
I-35W northbound: Night time construction work, alternating lane closure, short delay, width limit in effect. Width limit 11'6".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit