MN DOT 511 Traveler Information
I-35W
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT.

Web Comment: For project information: Click Here
Last updated yesterday at 5:45pm CDT
I-35W southbound: Road closed, night time construction work, follow the detour sign.
Between I-94 (Minneapolis) and 60th Street (Richfield). The road is closed. Night time construction work is in progress. Follow the detour signs. Until today at about 5:00AM CDT.

Web Comment: SB I-35W between I-94 and Hwy 62 – CLOSED Thursday July 18 and Friday, July 19 from 10 p.m. to 5 a.m. nightly Detour: WB I-394 to SB Hwy 100 to EB Hwy 62 For more info CLICK HERE
Last updated yesterday at 10:50am CDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35W
Map of Reports on I-35W Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between I-94 (Minneapolis) and 60th Street (Richfield). The road is closed. Night time construction work is in progress. Follow the detour signs. Until today at about 5:00AM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and US 10 (Mounds View). The right lane is closed. Look out for construction work. Until November 14, 2019 at about 5:00PM CDT. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until November 14, 2019 at about 11:45PM CDT. Between Exit 36 (Circle Pines) and Lake Drive (Lexington). Look out for construction work. Expect changing traffic patterns. Until November 14, 2019 at about 11:45PM CDT. Between Exit 36 (near Lino Lakes) and I-35; I-35E (near Forest Lake). The roadway is reduced to one lane. Major road construction work is in progress. Until October 26, 2019 at about 10:00PM CDT.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
I-35W southbound: Road closed, night time construction work, follow the detour sign.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit