MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
US 75
US 75 in both directions: Gross weight limit in effect. No vehicles over 80,000.00 lbs.
Between 4th Street Northeast and 7th Street Northeast (Pipestone). There is a weight limit in effect. No vehicles over 80,000.00 lbs.
Last updated on November 1
US 75 in both directions: Road closed, construction work, paving operation, bridge construction, detour in operation, see map for detour(s).
Between 5th Avenue North and County Road 80 (Wheaton). The road is closed. Look out for construction work. The road is being repaved. Bridge construction work is in progress. A detour is in operation. Until October 3, 2020 at about 12:00PM CDT.
Last updated on June 15
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 75
Map of Reports on US 75
US 75 in both directions: Gross weight limit in effect. No vehicles over 80,000.00 lbs.
US 75 in both directions: Road closed, construction work, paving operation, bridge construction, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit