US 2
US 2 in both directions: Opposing traffic sharing the roadway, construction work, length limit in effect, width limit in effect, gross weight limit in effect, delay. Width limit 11'0". Axle weight limit 20,000 lbs. Vehicle length limit 100 ft.
Between County Road 210 (near Erskine) and Southwest Mill Street (McIntosh). The roadway is shared with opposing traffic. Look out for construction work. There is a length limit in effect. There is a width limit in effect. There is a weight limit in effect. Expect delays. Width limit 11'0". Axle weight limit 20,000 lbs. Vehicle length limit 100 ft. Until July 19, 2019 at about 7:00PM CDT.

Web Comment: For project information CLICK HERE
Last updated on May 30
US 2 in both directions: Construction work, alternating lane closure, paving operation, look out for flagger, delay.
Between Adams Avenue Northwest (near Wilton) and MN 197; US 71 (near Bemidji). Look out for construction work. There are alternating lane closures. The road is being repaved. Look out for flaggers. Expect delays. Until Saturday, at about 6:00PM CDT.

Web Comment: No OSOW restrictions
Last updated on June 5
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 2
Map of Reports on US 2 Between County Road 210 (near Erskine) and Southwest Mill Street (McIntosh). The roadway is shared with opposing traffic. Look out for construction work. There is a length limit in effect. There is a width limit in effect. There is a weight limit in effect. Expect delays. Width limit 11'0". Axle weight limit 20,000 lbs. Vehicle length limit 100 ft. Until July 19, 2019 at about 7:00PM CDT. Between Adams Avenue Northwest (near Wilton) and MN 197; US 71 (near Bemidji). Look out for construction work. There are alternating lane closures. The road is being repaved. Look out for flaggers. Expect delays. Until Saturday, at about 6:00PM CDT.
US 2 in both directions: Opposing traffic sharing the roadway, construction work, length limit in effect, width limit in effect, gross weight limit in effect, delay. Width limit 11'0". Axle weight limit 20,000 lbs. Vehicle length limit 100 ft.
US 2 in both directions: Construction work, alternating lane closure, paving operation, look out for flagger, delay.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit