MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
I-94
I-94 in both directions: Road construction, narrow lane, width limit in effect. Width limit 11'0".
Between Exit 194: CR 18 (near Albertville) and Exit 207: MN 101; Main Street (Rogers). Road construction work is in progress. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until November 1, 2020 at about 7:00AM CDT.

Web Comment: For additional information on this project Click Here. Total width through construction zone is 22 ft from barrier to barrier, with 11 ft lane width.
Last updated on July 28
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-94
Map of Reports on I-94 Between Exit 173: Opportunity Drive (Clearwater) and Exit 205: MN 241 (near Albertville). Road construction work is in progress. Until October 31, 2020 at about 8:00PM CDT. Between Exit 178: MN 24 (near Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until September 28, 2020 at about 9:00AM CDT. Between Exit 194: CR 18 (near Albertville) and Exit 207: MN 101; Main Street (Rogers). Road construction work is in progress. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until November 1, 2020 at about 7:00AM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Exit 216: I-494; I-694 (Maple Grove). Road construction work is in progress. Until October 31, 2020 at about 8:00PM CDT. Between Riverside Avenue and Franklin Avenue (Minneapolis). The roadway is reduced to one lane. Night time construction work is in progress. Until Friday, at about 5:00AM CDT. Between Marion Street/Kellogg Boulevard and Exit 240: Dale Street (Saint Paul). Roadway reduced to one lane. Construction work. Starting tomorrow at 9:30AM CDT until tomorrow at about 3:00PM CDT. Between Exit 253: MN 95; Manning Avenue and Exit 258: MN 95; Saint Croix Trail North (Lakeland). The roadway is reduced to two lanes. Until today at about 3:00PM CDT.
I-94 in both directions: Road construction, narrow lane, width limit in effect. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit