I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CST.

Web Comment: For project information: Click Here
Last updated today at 6:55pm CST
I-35W in both directions: Roadway reduced to two lane, major road construction, width limit in effect. Width limit 16'0".
Between MN 36 (Lauderdale) and Exit 36 (Circle Pines). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 16'0". Until Saturday, at about 11:45PM CST.
Last updated on August 15
I-35W southbound: Roadway reduced to two lane, night time construction work, width limit in effect. Width limit 11'0".
Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. There is a width limit in effect. Width limit 11'0". Until today at about 11:45PM CST.

Web Comment: For additional information on this project Click Here
Last updated on September 3
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35W
Map of Reports on I-35W Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CST. Between MN 36 (Lauderdale) and Exit 36 (Circle Pines). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 16'0". Until Saturday, at about 11:45PM CST. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. There is a width limit in effect. Width limit 11'0". Until today at about 11:45PM CST.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
I-35W in both directions: Roadway reduced to two lane, major road construction, width limit in effect. Width limit 16'0".
I-35W southbound: Roadway reduced to two lane, night time construction work, width limit in effect. Width limit 11'0".