MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-35
I-35 northbound: Roadway reduced to one lane, width limit in effect, bridge maintenance operation. Width limit 13'0".
Between Exit 245: Carlton County Road 61 (Carlton and St.Louis County Line) (1 mile south of the Proctor area) and Exit 246 (near Proctor). The roadway is reduced to one lane. There is a width limit in effect. Bridge maintenance work is in progress. Width limit 13'0". Until June 25, 2021 at about 4:00PM CDT.

Web Comment: NB I-35, at junction of Midway Road, daytime lane closures due to bridge maintenance. Weekday, daytime restrictions only.
Last updated on June 15
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work, changing traffic pattern. Width limit 12'0".
Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT.

Web Comment: Northbound and Southbound I-35 is single lane from Garfield Avenue to 27th Avenue West. Single lane configuration will be in place through October. No restrictions on weeknights, weekends, and Holiday weekends. Loads wider than 12' can call for District approval. For more information and Weekly Updates on this project Click Here
Last updated today at 8:11am CDT
I-35 in both directions: Road closed, marathon, consider using an alternate route, delay.
Between Mesaba Avenue and Exit 259 (near Duluth). The road is closed. Look out for a marathon. Consider using an alternate route. Expect delays. Until Sunday, at about 2:00PM CDT.

Web Comment: Grandma's Marathon, Saturday, June 19th. Entrance ramps to I-35 in various locations will be closed and detoured. Expect congestion and delays before and after the marathon. Duluth PD will assist directing traffic during the event. For the Twin Ports Interchange construction ramp closures Click Here
Last updated yesterday at 7:50am CDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35
Map of Reports on I-35 Between Exit 175: Pine County Road 14 (Beroun) (1 mile north of the Pine City area) and Exit 183: MN 48; Fire Monument Road (Hinckley). A lane is closed. Road construction work is in progress. There is work on the shoulder. Until June 30, 2021 at about 2:00PM CDT. Between Exit 245: Carlton County Road 61 (Carlton and St.Louis County Line) (1 mile south of the Proctor area) and Exit 246 (near Proctor). The roadway is reduced to one lane. There is a width limit in effect. Bridge maintenance work is in progress. Width limit 13'0". Until June 25, 2021 at about 4:00PM CDT. Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT. Between Mesaba Avenue and Exit 259 (near Duluth). The road is closed. Look out for a marathon. Consider using an alternate route. Expect delays. Until Sunday, at about 2:00PM CDT.
I-35 northbound: Roadway reduced to one lane, width limit in effect, bridge maintenance operation. Width limit 13'0".
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work, changing traffic pattern. Width limit 12'0".
I-35 in both directions: Road closed, marathon, consider using an alternate route, delay.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit