MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions on I-90
I-90
Between Exit 1: MN 23 (Beaver Creek) and Exit 12: US 75 (Luverne). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 10'0". Until September 2, 2021 at about 5:00PM CDT.

Web Comment: Opposing traffic in eastbound lanes
Last updated on June 3
Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until October 1, 2021 at about 6:00PM CDT.

Web Comment: Opposing traffic in the westbound lanes; posted detours
Last updated on May 24
At Exit 181: 28th Street Northeast (near Austin). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. Expect delays. There is a width limit in effect. Width limit 12'0". Until November 5, 2021 at about 5:00PM CDT.

Web Comment: For additional information CLICK HERE
Last updated on May 10
Between Exit 205: Olmsted County Road 6 and Exit 218: US 52 (near Stewartville). The roadway is reduced to one lane. Look out for construction work. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until August 27, 2021 at about 5:00PM CDT.
Last updated on July 22