MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-35W
I-35W northbound: Road reconstruction, follow the sign, width limit in effect, because of construction work. Width limit 13'0".
Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The road is being reconstructed. Follow the signs. There is a width limit in effect because of construction work. Width limit 13'0".

Web Comment: NORTHBOUND LEFT LANE- Is A Through Lane Starting at County Road B2. There Are No Northbound Exits Available Until County Road 52. MIDDLE LANE - Is A Through Lane With No Northbound Exits Available Starting At County Road 10 Until Trunk Highway 10.. RIGHT LANE- Is Open to All Open Northbound Ramps And Exits. ALL LANES Have a 13 Foot Lane Restriction. Please Check For Permit Requirements.
Last updated on May 20
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35W
Map of Reports on I-35W Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The road is being reconstructed. Follow the signs. There is a width limit in effect because of construction work. Width limit 13'0". Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The roadway is reduced to one lane because of construction work. From 8:00PM CDT to 5:00AM CDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Until Friday, at about 5:00AM CDT. Between Exit 30: US 10 (Mounds View) and Exit 25: Ramsey County Road 88 (New Brighton). The roadway is reduced to one lane because of construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Between Exit 32: 95th Avenue (Lexington) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Between Exit 28: Ramsey County Road H and Exit 30: US 10 (Mounds View). The roadway is reduced to one lane. Width limit 12'5". Until July 18, 2021 at about 5:00AM CDT.
I-35W northbound: Road reconstruction, follow the sign, width limit in effect, because of construction work. Width limit 13'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit