MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions on I-94
I-94
At Exit 178: MN 24 (Clearwater). The roadway is reduced to two lanes. There is a width limit in effect. Look out for construction work. Short delays are possible. Observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft. Until October 15, 2021 at about 11:59PM CDT.
Last updated on September 10
Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT.
Last updated on September 7
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Last updated on September 14
Between Exit 236: MN 280 (near Lauderdale) and I-35W (Minneapolis). The road is closed. Night time construction work is in progress because of bridge maintenance work. From 10:00PM CDT to 5:00AM CDT daily. Until October 6, 2021 at about 5:00AM CDT.

Web Comment: Nightly closure to repair the 25th Ave overpass.
Last updated today at 7:13pm CDT