MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions on I-94
I-94
Between Exit 178: MN 24 (near Clearwater) and Exit 193: MN 25 (Monticello). There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Until September 6, 2021 at about 12:00PM CDT.
Last updated on June 11
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Last updated today at 4:04pm CDT
At Exit 205: MN 241 (near Rogers). The roadway is reduced to one lane. The road is closed. Night time construction work is in progress. Look out for bridge demolition work. Bridge construction work is in progress. A detour is in operation. From 7:00PM CDT to 8:00AM CDT daily. Until Thursday, at about 8:00AM CDT.

Web Comment: Thursday night Lane Closure begin at 7 pm, and I-94 traffic utilizing off/on ramps between 10pm – 5am Friday/Saturday nights Lane Closure begins at 8 pm, and I-94 traffic utilizing off/on ramps between 10 pm – 8 am Sunday night Lane Closure begins at 8 pm, and I-94 traffic utilizing off/on ramps between 10 pm – 6 am Monday/Tuesday/Wednesday nights Lane Closure begin at 7 pm, and I-94 traffic utilizing off/on ramps between 8 pm – 6 am
Last updated today at 2:49pm CDT