MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
MN 73
MN 73: Roadway reduced to one lane, width limit in effect, bridge inspection work is in progre. Width limit 12'0".
Between Goodell Road and MN 1 (12 to 22 miles north of the Chisholm area). The roadway is reduced to one lane. There is a width limit in effect. Bridge inspection work is in progress. Width limit 12'0". Until tomorrow at about 3:00PM CDT.

Web Comment: MN 73 daytime lane closures with daytime restrictions.
Last updated on April 23
MN 73: Lane closed, width limit in effect, road construction. Width limit 12'0".
Between MN 1 and US 53 (22 to 27 miles north of the Chisholm area). A lane is closed. There is a width limit in effect. Road construction work is in progress. Width limit 12'0". Until July 6, 2021 at about 2:00PM CDT.

Web Comment: MN 73, between MN 1 and US 53, lane closures for resurfacing road and culvert repair.
Last updated on May 3
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on MN 73
Map of Reports on MN 73 Between Goodell Road and MN 1 (12 to 22 miles north of the Chisholm area). The roadway is reduced to one lane. There is a width limit in effect. Bridge inspection work is in progress. Width limit 12'0". Until tomorrow at about 3:00PM CDT. Between MN 1 and US 53 (22 to 27 miles north of the Chisholm area). A lane is closed. There is a width limit in effect. Road construction work is in progress. Width limit 12'0". Until July 6, 2021 at about 2:00PM CDT.
MN 73: Roadway reduced to one lane, width limit in effect, bridge inspection work is in progre. Width limit 12'0".
MN 73: Lane closed, width limit in effect, road construction. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit