MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
MN 73
MN 73: Lane closed, width limit in effect, road construction. Width limit 12'0".
Between MN 1 and US 53 (22 to 27 miles north of the Chisholm area). A lane is closed. There is a width limit in effect. Road construction work is in progress. Width limit 12'0". Until July 6, 2021 at about 2:00PM CDT.

Web Comment: MN 73, between MN 1 and US 53, lane closures for resurfacing road and culvert repair. For more information on this project Click Here
Last updated on May 6
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on MN 73
Map of Reports on MN 73 Between North Leighton Road and Town Line Road (near Hibbing). A lane is closed. Bridge construction work is in progress. Look out for temporary traffic lights. Until June 22, 2021 at about 2:00PM CDT. Between MN 1 and US 53 (22 to 27 miles north of the Chisholm area). A lane is closed. There is a width limit in effect. Road construction work is in progress. Width limit 12'0". Until July 6, 2021 at about 2:00PM CDT.
MN 73: Lane closed, width limit in effect, road construction. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit