I-94
I-94 westbound: Roadway reduced to one lane, bridge maintenance operation, look out for flagger, width limit in effect. Width limit 12'0".
Between Exit 1: 20th Street and Exit 1: US 75 (Moorhead). The roadway is reduced to one lane. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until today at about 4:00PM CDT.
Last updated today at 10:13am CDT
I-94 in both directions: Roadway reduced to two lane, width limit in effect, construction work, short delay, observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft.
At Exit 178: MN 24 (Clearwater). The roadway is reduced to two lanes. There is a width limit in effect. Look out for construction work. Short delays are possible. Observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft. Until October 15, 2021 at about 11:59PM CDT.
Last updated on September 10
I-94 in both directions: Roadway reduced to one lane, night time construction work, traffic held, speed restrictions in force.
Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT.
Last updated on September 7
I-94 eastbound: Construction work, width limit in effect. Width limit 11'0".
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Last updated on September 14
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-94
Map of Reports on I-94 Between Exit 1: 20th Street and Exit 1: US 75 (Moorhead). The roadway is reduced to one lane. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until today at about 4:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT. Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work. Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until September 25, 2021 at about 9:00AM CDT. Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT.
I-94 westbound: Roadway reduced to one lane, bridge maintenance operation, look out for flagger, width limit in effect. Width limit 12'0".
I-94 in both directions: Roadway reduced to two lane, width limit in effect, construction work, short delay, observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft.
I-94 in both directions: Roadway reduced to one lane, night time construction work, traffic held, speed restrictions in force.
I-94 eastbound: Construction work, width limit in effect. Width limit 11'0".