MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-94
I-94 in both directions: Roadway reduced to two lane, width limit in effect, construction work, short delay, observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft.
At Exit 178: MN 24 (Clearwater). The roadway is reduced to two lanes. There is a width limit in effect. Look out for construction work. Short delays are possible. Observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft. Until October 15, 2021 at about 11:59PM CDT.
Last updated on September 10
I-94 in both directions: Roadway reduced to one lane, night time construction work, traffic held, speed restrictions in force.
Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT.
Last updated on September 7
I-94 eastbound: Construction work, width limit in effect. Width limit 11'0".
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Last updated on September 14
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-94
Map of Reports on I-94 Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT. Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work. Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT.
I-94 in both directions: Roadway reduced to two lane, width limit in effect, construction work, short delay, observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft.
I-94 in both directions: Roadway reduced to one lane, night time construction work, traffic held, speed restrictions in force.
I-94 eastbound: Construction work, width limit in effect. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit