MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-35W
I-35W in both directions: Night time construction work, intermittent lane closure.
Between Exit 14: East 36th Street and I-94 (Minneapolis). Night time construction work is in progress. A lane is closed intermittently. From 10:00PM CDT to 5:00AM CDT on weekdays. Until today at about 7:00AM CDT.

Web Comment: Watch for various nighttime lane closures throughout the project. For more information about this project a href="http://www.dot.state.mn.us/35w94/" target="_blank">CLICK HERE
Last updated on September 13
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-35W
Map of Reports on I-35W Between Exit 14: East 36th Street and I-94 (Minneapolis). Night time construction work is in progress. A lane is closed intermittently. From 10:00PM CDT to 5:00AM CDT on weekdays. Until today at about 7:00AM CDT. Between MN 55 and 3rd Street (Minneapolis). The roadway is reduced to two lanes. Night time construction work is in progress. Until Monday, at about 5:00AM CDT.
I-35W in both directions: Night time construction work, intermittent lane closure.
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit