MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Truck Restrictions—Statewide
Map of Statewide Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until tomorrow at about 9:00AM CDT. Between West River Road (Champlin) and Calhoun Street (Anoka). The roadway is reduced to one lane. Until tomorrow at about 7:00PM CDT. Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT. Between MN 55; 5th Street and Groveland Avenue (Minneapolis). The roadway is reduced to one lane. Look out for construction work. Until today at about 10:00PM CDT. Between Laurie Lane and Jonathan Carver Parkway (near Carver). Road construction work is in progress. There is a width limit in effect. Look out for flaggers. Width limit 11'0". Until October 31, 2021 at about 3:00PM CDT.
US 212 in both directions: Road construction, width limit in effect, look out for flagger. Width limit 11'0".
MN 83 in both directions: Roundabout, width limit in effect, length limit in effect. Width limit 16'0". Vehicle length limit 110 ft.
MN 60 in both directions: Permitted oversize loads are prohibited, roadway reduced to two lane, because of bridge maintenance work, narrow lane, width limit in effect. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit