MN DOT 511 Traveler Information
We've been listening to you.Try phase 2 of our updated 511 website and leave us feedback!
MN 61: Roadway reduced to one lane, width limit in effect, road construction, pilot car in operation. Width limit 8'6".
MN 61: Roadway reduced to one lane.
Between County Road 89 and Mineral Center Road (27 to 30 miles east of the Grand Marais area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. A pilot car is in operation. Width limit 8'6". Until October 6, 2020 at about 2:00PM CDT.

Web Comment: MN 61, near Grand Portage, lane closures with bypass for culvert replacement. Only legal width loads. Loads up to 12' wide can call for District approval. For more information on this project Click Here
Last updated on September 16
MN 61: Roadway reduced to one lane.
Map of MN 61: Roadway reduced to one lane.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit