MN DOT 511 Traveler Information
MN 6 in both directions: Paving operation, alternating lane closure, pilot car in operation, look out for flagger, width limit in effect. Width limit 10'5".
MN 6 in both directions: Paving operations.
Between Prushek Road (3 miles north of the Cuyuna area) and Woods Bay Drive Northeast (1 mile north of the Emily area). The road is being repaved. There are alternating lane closures. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 10'5". From 6:00AM CDT to 9:00PM CDT on weekdays and Saturday. Until August 30, 2019 at about 9:00PM CDT.

Web Comment: For additional information on this project Click Here
Last updated on July 9
MN 6 in both directions: Paving operations.
Map of MN 6 in both directions: Paving operations.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit