MN DOT 511 Traveler Information
MN 13 in both directions: Road closed, major road construction, paving operation, detour in operation, see map for detour(s).
MN 13 in both directions: Road closed.
Between MN 282 and 180th Street East (near Prior Lake). The road is closed. Major road construction work is in progress. The road is being repaved. A detour is in operation. Until June 21, 2019 at about 12:00PM CDT.

Web Comment: The MN-13/CR-21 construction project in Prior Lake will take place over multiple stages, with various sections of MN-13 closed during the duration of the project, through mid-October, 2019. Through traffic should follow the posted detour. For additional project information, click here. No OSOW restrictions
Last updated on May 16
MN 13 in both directions: Road closed.
Map of MN 13 in both directions: Road closed.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit