MN DOT 511 Traveler Information
US 212 in both directions: Road construction, alternating lane closures, paving operations, look out for flaggers, width limit in effect, traffic held.
US 212 in both directions: Road construction.
Between US 59; Southwest 1st Street (Montevideo) and MN 67 (Granite Falls). Road construction work is in progress. There are alternating lane closures. The road is being repaved. Look out for flaggers. There is a width limit in effect. Traffic is being held. Expect delays. Width limit 12'0". Until September 14, 2018 at about 8:00PM CDT.

Web Comment: For more information Click Here"
Last updated on July 5
US 212 in both directions: Road construction.
Map of US 212 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit