MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
MN 60 in both directions: Roadway reduced to one lane, bridge maintenance operation, temporary traffic light, delay, width limit in effect. Width limit 12'0".
MN 60 in both directions: Roadway reduced to one lane.
Between 4th Grant Boulevard West and Wisconsin State Line (Wabasha). The roadway is reduced to one lane. Bridge maintenance work is in progress. Look out for temporary traffic lights. Expect delays. There is a width limit in effect. Width limit 12'0". Until September 3, 2021 at about 8:00PM CDT.

Web Comment: Traffic will be alternating, controlled by a traffic signal.
Last updated on April 29
MN 60 in both directions: Roadway reduced to one lane.
Map of MN 60 in both directions: Roadway reduced to one lane.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit