MN DOT 511 Traveler Information
US 71 in both directions: Construction work, temporary lane markings, width limit in effect.
US 71 in both directions: Construction work.
Between County Road 10 and 2nd Avenue North (near Long Prairie). Look out for construction work. There are temporary lane markings. There is a width limit in effect. Width limit 11'0". Until September 29, 2017 at about 8:00PM CDT.
Last updated on September 13
US 71 in both directions: Construction work.
Map of US 71 in both directions: Construction work.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Axle Load Limit Axle Load Limit