MN DOT 511 Traveler Information
We've been listening to you.Try phase 2 of our updated 511 website and leave us feedback!
Weather Stations—Southeast MN
Map of Southeast MN Between 40th Avenue Southeast (1 mile east of the Rochester area) and MN 42 (Eyota). The road is closed. Bridge construction work is in progress. A detour is in operation. Until Friday, at about 5:00PM CDT. Between 8th Street Southeast and East Elm Avenue (Waseca). The road is closed due to road construction work. A detour is in operation. Look out for flaggers. Until Friday, at about 5:00PM CDT. Between 2nd Street and County Road 4 (1 to 2 miles north of the Wabasha area). Road maintenance work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. Width limit 10'0". Until today at about 10:00PM CDT. Between Elm Street East and Chestnut Street East (Stillwater). The roadway is reduced to one lane. Utility work is in progress. Until Friday, at about 5:00PM CDT. Between MN 62 and I-494 (near Mendota). The road is closed. Follow the detour signs. Until Friday, at about 6:00PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed due to road construction work. A detour is in operation. Until November 9, 2020 at about 5:00PM CDT. Between East Centre Street and West Grant Street (Lake City). The road is closed. Look out for construction work. A detour is in operation. Short delays are possible. Overloads are not permitted. Width limit 9'0". Height limit 14'0". Vehicle length limit 75.00 ft. No vehicles over 80,000.00 lbs. Until tomorrow at about 5:00PM CDT. Between Exit 266: Winona County Road 12 and Exit 270: US 61 (near Dakota). The roadway is reduced to one lane. Bridge construction work is in progress. There is a width limit in effect. Width limit 12'0". Until November 6, 2020 at about 9:00PM CDT. Between T-145 and County Road 45 (Courtland). The road is closed because of construction work. A detour is in operation. Until November 26, 2020 at about 5:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The roadway is reduced to one lane. Bridge construction work is in progress. Until December 31, 2020 at about 6:00PM CDT. Between Exit 163 (near Hayward) and Exit 175: MN 105; Oakland Avenue West (near Austin). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Until November 15, 2020 at about 7:00PM CDT. Between Dakota County Road 42 (Burnsville) and Exit 94: Diffley Rd (Eagan). Lane closed. Starting today at 7:00PM CDT until Thursday, at about 6:00AM CDT. Between Exit 104: Shady Oak Road (near Hopkins) and US 212 (Edina). The roadway is reduced to one lane. Look out for construction work. Until November 20, 2020 at about 11:00PM CDT. Between Yale Avenue (near Plato) and Tacoma Avenue (Norwood Young America). The roadway is reduced to one lane. Look out for construction work. Until November 1, 2020 at about 5:00AM CDT. Between West Bush Lake Road and Exit 8: East Bush Lake Road (near Edina). The roadway is reduced to two lanes. Road maintenance work is in progress. Between Wentworth Avenue East and Thompson Avenue East (West Saint Paul). The roadway is reduced to one lane. Road construction work is in progress. Until Friday, at about 6:00PM CDT. Between MN 36 (Lauderdale) and Ramsey County Road D (Saint Anthony). The roadway is reduced to two lanes. Look out for construction work. Width limit 13'0". Until November 15, 2020 at about 1:00AM CDT. Between Main Street (Green Isle) and US 212 (near Hamburg). The road is closed due to road construction work. A detour is in operation. Until November 6, 2020 at about 5:00PM CDT. Between 44th Ave Southwest and US 63; 90th Street Southeast (near Stewartville). The road is closed. Road construction work is in progress. A detour is in operation. Until Friday, at about 5:00PM CDT. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until Friday, at about 5:00PM CDT. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between US 14 (near Dodge Center) and 560th Street (West Concord). The road is closed. Look out for construction work. A detour is in operation. Until November 6, 2020 at about 5:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Exit 216: I-494; I-694 (Maple Grove). Road construction work is in progress. Until Saturday, at about 8:00PM CDT.
US 14: Waseca
I-90: Ridgeway
I-494: Maple Grove
US 52: Canton
MN 25: Mayer
MN 7: New Germany
I-35: Hope
US 61: Kellogg
US 169: St. Peter
I-90: Blue Earth
MN 44: Hokah
I-35W: Minnesota River
I-494: I-494 @ Minnetonka Blvd.
I-90: Eyota
I-90: Dexter
MN 60: Madelia
I-35E: Little Canada
US 14: Waseca
MN 7: Silver Lake
MN 19: New Prague
I-35E: Cayuga
US 14: Byron
US 169: Henderson
US 52: Cannon Falls
I-35: Little Chicago
I-35: Twin Lakes
US 63: Stewartville
US 169: Mankato
US 61: Red Wing
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing