MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Weather Stations—South Central MN
Map of South Central MN Between Lexington Parkway and Exit 240: Dale Street (near Saint Paul). The roadway is reduced to one lane. Until today at about 2:00PM CDT. Between CR 61; Chaska Boulevard (Carver) and CR 10; Engler Boulevard (Chaska). The roadway is reduced to one lane. Bridge maintenance work is in progress. Until Friday, at about 5:00PM CDT. Between Old Minnesota Avenue and MN 22 (Saint Peter). The roadway is reduced to one lane because the road is being repaved. Until Thursday, at about 8:00PM CDT. Between MN 112 (Le Sueur) and Old Minnesota Avenue (Saint Peter). The roadway is reduced to one lane because the road is being repaved. Until Thursday, at about 8:00PM CDT. Between 2nd Street and County Road 4 (1 to 2 miles north of the Wabasha area). Road maintenance work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. Width limit 10'0". Until October 27, 2020 at about 10:00PM CDT. Between South Davern Street and MN 62 (Mendota). The roadway is reduced to one lane. Road construction work is in progress. Until Friday, at about 6:00PM CDT. Between Old Highway 169 Boulevard and Mill Street (Jordan). The road is closed. Bridge construction work is in progress. Until October 26, 2020 at about 11:59PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed due to road construction work. A detour is in operation. Until October 16, 2020 at about 5:00PM CDT. Between Exit 123: Main Street (near Lino Lakes) and I-35; I-35W (near Forest Lake). The roadway is reduced to one lane. Road construction work is in progress. Between Exit 31: Lake Drive (Lexington) and Exit 36: Anoka County Road 23 / Lake Drive (Circle Pines). Road construction work is in progress. Width limit 14'0". Until August 29, 2020 at about 5:00AM CDT. Between 14th S Street and 4th S Street (New Ulm). The road is closed due to road construction work. A detour is in operation. Until Friday, at about 5:00PM CDT. Between Davis Avenue (Westbrook) and US 71 (near Jeffers). The roadway is reduced to one lane due to road construction work. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until October 15, 2020 at about 5:00PM CDT. Between Exit 194: CR 18 (near Albertville) and Exit 207: MN 101; Main Street (Rogers). Road construction work is in progress. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until November 1, 2020 at about 7:00AM CDT. Between 350th Street (5 miles south of the Gaylord area) and Southview Avenue South (Gaylord). The road is closed due to road construction work. A detour is in operation. Until October 13, 2020 at about 5:00PM CDT. Between Maple Avenue South and Cherry Avenue South (Annandale). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. Until Friday, at about 12:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The roadway is reduced to one lane. Bridge construction work is in progress. Until December 31, 2020 at about 6:00PM CDT. Between US 61; Plum Street and Wisconsin State Line (near Red Wing). The roadway is reduced to one lane. Bridge construction work is in progress. There is a width limit in effect. Width limit 14'0". Until September 30, 2020 at about 5:00PM CDT. Between Exit 163 (near Hayward) and Exit 175: MN 105; Oakland Avenue West (near Austin). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Until November 15, 2020 at about 7:00PM CDT. Between MN 22; County Road 29 (near Mapleton) and Dogwood Avenue South (New Richland). The road is closed due to road construction work and due to bridge construction work. The road is open for local access only. A detour is in operation. Until October 2, 2020 at about 5:00PM CDT. Between Exit 131: Broadway (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Night time construction work is in progress. Between I-494; I-94 and Exit 57: 10th Street North (near Oakdale). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until November 1, 2020 at about 11:59PM CDT. Between Sunset Avenue Northwest and 60th Street Southwest (Cokato). Road construction work is in progress. Look out for flaggers. A pilot car is in operation. Expect delays. There is a width limit in effect. Width limit 11'0". Until October 23, 2020 at about 5:00PM CDT. Between MN 77; Cedar Avenue (Richfield) and Exit 7: MN 100; Normandale Boulevard (near Edina). The roadway is reduced to two lanes. Night time construction work is in progress. Until August 31, 2020 at about 6:00AM CDT. Between I-494 and South Davern Street (near Mendota). The road is closed. Road construction work is in progress. Follow the detour signs. Until Friday, at about 6:00PM CDT. Between Yale Avenue (near Plato) and Tacoma Avenue (Norwood Young America). The roadway is reduced to one lane. Look out for construction work. Until November 1, 2020 at about 5:00AM CDT. Between MN 22 and County Road 34 (Litchfield). The road is closed. Look out for construction work. A detour is in operation. Until October 31, 2020 at about 8:00PM CDT. Between East Saint Paul Street and US 12; West Depot Street (Litchfield). The road is closed. Road construction work is in progress. A detour is in operation. Until October 31, 2020 at about 8:00PM CDT. Between West Bush Lake Road and Exit 8: East Bush Lake Road (near Edina). The roadway is reduced to two lanes. Road maintenance work is in progress. Between 5th Avenue Southwest and 2nd Avenue Southwest (Hutchinson). The road is closed to traffic. Look out for construction work. A detour is in operation. There is a width limit in effect. Short delays are possible. Width limit 11'0". Until October 31, 2020 at about 12:00PM CDT. Between 86th Street (Bloomington) and West 76th Street (Richfield). The roadway is reduced to two lanes. Night time construction work is in progress. Until August 31, 2020 at about 6:00AM CDT. Between Main Street (Green Isle) and US 212 (near Hamburg). The road is closed due to road construction work. A detour is in operation. Until October 30, 2020 at about 5:00PM CDT. Between 70th Street South (near Cottage Grove) and US 61 (near Hastings). The road is closed. Road construction work is in progress. A detour is in operation. Until August 28, 2020 at about 11:45PM CDT. Between 44th Ave Southwest and US 63; 90th Street Southeast (near Stewartville). The road is closed. Road construction work is in progress. A detour is in operation. Until October 30, 2020 at about 5:00PM CDT. Between 367th Avenue and MN 295; Freeman Drive (Kasota). The roadway is reduced to one lane due to emergency maintenance activities. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2020 at about 5:00PM CDT. Between East Fillmore Avenue and Kellogg Boulevard (Saint Paul). The bridge is closed. Bridge construction work is in progress. Until August 22, 2020 at about 11:45PM CDT. Between I-35 (Clarks Grove) and 850th Avenue (Hollandale). The road is closed. Look out for construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until November 1, 2020 at about 7:00PM CDT. Between I-35 (Clarks Grove) and 850th Avenue (Hollandale). Look out for construction work. The road is being repaved. There is a width limit in effect. Width limit 11'0". Until November 1, 2020 at about 7:00PM CDT. Between 290th Avenue (near Cottonwood) and US 212; Granite Street (Granite Falls). The road is closed. Road construction work is in progress. There is a width limit in effect. A detour is in operation. Width limit 11'0". Until October 30, 2020 at about 8:00PM CDT. Between 133rd Street West (near Carver) and Old Brick Yard Road (near Chaska). Look out for construction work. The roadway is reduced to one lane. There is head to head traffic on the roadway. There is a width limit in effect. There is a length limit in effect. Vehicle length limit 67.00 ft. Width limit 10'0". Until August 21, 2020 at about 6:00PM CDT. Between Exit 59: Valley Creek Road (near Woodbury) and Exit 58: I-694; I-94 (near Oakdale). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until November 1, 2020 at about 5:00PM CDT. Between East 5th Street and Bush Street (near Red Wing). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 12'0". Until August 20, 2020 at about 5:00PM CDT. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between MN 55; West Harrison Street and 90th Street Northwest (Annandale). The road is closed. Road construction work is in progress. A detour is in operation. Until November 27, 2020 at about 5:00PM CDT. Between County Road B1 and 600th Street (1 to 2 miles east of the Granite Falls area). The road is closed. The road surface has collapsed. Follow the detour signs. Until April 30, 2021 at about 1:00PM CDT. Between Marion Road Southeast and 11th Avenue Southeast (near Rochester). The roadway is reduced to one lane. Bridge maintenance work is in progress. Expect delays. There is a width limit in effect. Width limit 10'0". Until August 20, 2020 at about 4:00PM CDT. Between East 5th Street and US 63; Plum Street (near Red Wing). The roadway is reduced to one lane. Look out for construction work. Short delays are possible. There is a width limit in effect. Width limit 14'0". Between US 63 and 500th Street (near Oronoco). The roadway is reduced to one lane. Look out for construction work. Until October 30, 2020 at about 5:00PM CDT. Between Exit 102: MN 15; North State Street (near Fairmont) and Exit 119: US 169 (Blue Earth). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 9, 2020 at about 5:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Exit 216: I-494; I-694 (Maple Grove). Road construction work is in progress. Until October 31, 2020 at about 8:00PM CDT. Between Exit 173: Opportunity Drive (Clearwater) and Exit 205: MN 241 (near Albertville). Road construction work is in progress. Until October 31, 2020 at about 8:00PM CDT. Between Exit 233: MN 74 (Saint Charles) and Exit 229: Olmsted County Road 10 (Dover). The roadway is reduced to one lane. Look out for construction work. Until Friday, at about 5:00PM CDT. Between MN 247; East Broadway (Plainview) and 608th Street (near Kellogg). The road is closed. Road construction work is in progress. A detour is in operation. Expect delays. Until tomorrow at about 10:00PM CDT.
US 14: Waseca
I-494: Maple Grove
MN 19: Winthrop
MN 25: Mayer
US 14: Waseca
I-35E: Cayuga
I-35W: Minnesota River
I-90: Blue Earth
I-90: Dexter
I-35: Little Chicago
MN 23: Hanley Falls
US 169: St. Peter
I-90: Eyota
MN 19: New Prague
I-494: I-494 @ Minnetonka Blvd.
I-35E: Little Canada
MN 60: Madelia
US 169: Henderson
MN 30: Dovray
US 169: Mankato
US 71: Morton
US 63: Stewartville
MN 7: Silver Lake
US 71: Jeffers
I-35: Twin Lakes
I-35: Hope
I-90: Lakefield
MN 7: New Germany
US 14: Byron
MN 7: Clara City
US 52: Cannon Falls
US 61: Red Wing
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing