MN DOT 511 Traveler Information
Weather Stations—South Central MN
Map of South Central MN Between MN 22 (Mankato) and CR 12 (near Eagle Lake). The roadway is reduced to one lane because of road maintenance activities. Until October 24, 2018 at about 3:00PM CDT. Between 700th Avenue and MN 4 (near Saint James). The exit ramp is closed. The entrance ramp is closed due to road work. There is a width limit in effect. A detour is in operation. Width limit 10'0". Until November 2, 2018 at about 4:00PM CDT. Between I-494 (Mendota Heights) and West George Street (Saint Paul). Be aware of narrow lanes. Look out for construction work. There is a width limit in effect. Width limit 10'0". From 12:00AM CDT to 12:00PM CDT daily. Until October 31, 2018 at about 12:00PM CDT. Between MN 15 and MN 15; County Road 21 (New Ulm). The road is closed because of construction work. A detour is in operation. Until March 20, 2019 at about 3:00PM CDT. Between MN 55; 5th Street and 3rd Avenue (Minneapolis). The roadway is reduced to two lanes. Major road construction work is in progress. Until October 22, 2018 at about 5:00PM CDT. Between West Lind Court and Old River Bluff Rd (near North Mankato). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Width limit 11'0". Until November 15, 2018 at about 4:00PM CDT. Between 70th Street East and 60th Street West (Sunfish Lake). The road is closed. Look out for construction work. Until November 16, 2018 at about 5:00PM CDT. Between Water Street (Zumbro Falls) and County Road 15 (near Lake City). Road construction work is in progress. There are alternating lane closures because the road is being repaved. Look out for flaggers. There is a width limit in effect. Width limit 10'0". Until Friday, at about 8:30PM CDT. Between Riverside Avenue and Cedar Avenue (Minneapolis). The right lane is closed because of night time construction work. From 8:00PM CDT to 6:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Between MN 4 and 760th Avenue (near Saint James). The exit ramp is closed. The entrance ramp is closed due to road construction work. There is a width limit in effect. A detour is in operation. Width limit 10'0". Until November 2, 2018 at about 3:00PM CDT. Between Horner Avenue and Fahey Avenue South (1 mile east of the Coates area). The road is closed. Follow the detour signs. Until November 9, 2018 at about 5:00PM CDT. Between MN 149 and MN 55 (near Inver Grove Heights). The road is closed. Major road construction work is in progress. Follow the local detour. Until November 23, 2018 at about 5:00PM CDT. Between 125th Street (near Blue Earth) and Timberwolf Lane (Winnebago). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Look out for flaggers. A pilot car is in operation. There is work on the shoulder. Width limit 10'0". Until November 2, 2018 at about 3:00PM CDT. Between Exit 193: MN 25 and Exit 194: CR 18 (Monticello). The roadway is reduced to two lanes. Bridge construction work is in progress. Until November 15, 2018 at about 10:30AM CDT. Between I-494 and Lyndale Avenue (Richfield). The roadway is reduced to one lane. There are alternating lane closures. Night time construction work is in progress. Until tomorrow at about 6:00AM CDT. Between John Caldwell Drive (Windom) and County Road 47 (Mountain Lake). Road construction work is in progress. There is work on the shoulder. Look out for flaggers. People are working in the median. There is a width limit in effect. Width limit 10'0". Until December 6, 2018 at about 2:00PM CDT. Between Exit 30: US 10 (Mounds View) and Exit 36 (Circle Pines). The roadway is reduced to one lane. Night time construction work is in progress. Until Saturday, at about 12:00PM CDT. Between Fergus Avenue and Cleveland Avenue (Morgan). Be aware of narrow lanes. Road construction work is in progress. There is work on the shoulder. Utility work is in progress. Consider using an alternate route. There is a width limit in effect. Width limit 12'0". Until October 30, 2018 at about 5:00PM CDT. Between Armstrong Boulevard South and 11th Avenue North (Saint James). The road is closed due to road work. There is a width limit in effect. There is an axle load limit in effect. Width limit 10'0". Axle weight limit 18,000 lbs. Until October 26, 2018 at about 11:00AM CDT. Between I-94 and Elm Creek Boulevard (Maple Grove). The left lane is closed. Road construction work is in progress. Expect delays. Until October 27, 2018 at about 6:00PM CDT. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Night time construction work is in progress. There are alternating lane closures. From 7:00PM CDT to 6:00AM CDT daily. Until Saturday, at about 6:00AM CDT. Between 690th Avenue (near Saint James) and MN 15 (near Lewisville). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 10'0". Speed limit 55 MPH. Until November 16, 2018 at about 2:00PM CDT. Between I-494; W 62nd Street and Exit 104: Shady Oak Road (near Hopkins). The roadway is reduced to one lane. From 9:00AM CDT to 4:00PM CDT on Wednesday, Thursday and Friday. Until Friday, at about 4:00PM CDT. Between Patterson Avenue and Webster Avenue (near Mankato). The shoulder is closed due to emergency maintenance activities. Between Hardman Avenue and Exit 65: 7th Avenue (South Saint Paul). Look out for construction work. There are alternating lane closures. The exit ramp is closed. The entrance ramp is closed. There is a width limit in effect. Width limit 11'0". Until November 15, 2018 at about 6:00PM CDT. Between Bush Street and Withers Harbor Drive (near Red Wing). The right lane is closed due to road construction work and due to bridge construction work. Expect delays. There is a width limit in effect. There is a height limit in effect. Width limit 11'0". Height limit 14'6". Until September 30, 2019 at about 11:59PM CDT. Between I-494; W 62nd Street (near Hopkins) and Exit 107: Tracy Avenue (Edina). The roadway is reduced to one lane. From 9:00PM CDT to 5:00AM CDT on Wednesday, Thursday and Friday. Until Friday, at about 5:00AM CDT. Between Shady Oak Road and MN 62 (near Edina). The roadway is reduced to one lane. From 9:00PM CDT to 5:00AM CDT on Wednesday, Thursday and Friday. Until Friday, at about 5:00AM CDT. Between Exit 18: University Avenue (near Lauderdale) and Exit 24: Ramsey County Road C (Saint Anthony). The roadway is reduced to two lanes. Night time construction work is in progress. From 9:00PM CDT to 5:00AM CDT daily. Until October 27, 2018 at about 5:00AM CDT. Between Exit 13: I-90 (near Albert Lea) and Exit 26: MN 30 (Geneva). There are alternating lane closures due to road construction work. There is a width limit in effect. Width limit 12'0". Until November 22, 2018 at about 4:30PM CDT. Between 85th Avenue Northeast (Spring Lake Park) and Sims Road Northeast (East Bethel). Look out for construction work. There are alternating lane closures. Until November 16, 2018 at about 9:00PM CDT. Between T-80 (2 miles north of the Mapleton area) and Hoffman Road (near Mankato). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 10'0". Until November 5, 2018 at about 1:00PM CDT. Between Saint Anthony Avenue and University Avenue (near Saint Paul). Look out for construction work. There are alternating lane closures. Until Friday, at about 5:00PM CDT. Between Exit 48: West Central Avenue (Medford) and Exit 69: MN 19; Lonsdale Boulevard (5 miles south of the Elko New Market area). The roadway is reduced to one lane because the road is being repaved. There is a width limit in effect. Width limit 12'0". Until October 26, 2018 at about 5:00PM CDT. Between MN 36 (Roseville) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until Saturday, at about 12:00PM CDT. Between MN 19 (near Henderson) and Delaware Avenue (near Jordan). Look out for construction work. Expect changing traffic patterns. Until October 30, 2018 at about 4:00AM CDT. Between West George Street and West Goodrich Avenue (near Saint Paul). The bridge is closed. Bridge construction work is in progress. Until December 27, 2018 at about 5:00PM CDT. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Roadway reduced to one lane. Exit ramp closed. Starting tomorrow at 10:00PM CDT until Thursday, at about 6:00AM CDT. Between I-394 and Groveland Avenue (Minneapolis). Right lane closed. Night time construction work. Starting tomorrow at 10:00PM CDT until Thursday, at about 5:00AM CDT. Between Exit 32: Steele County Road 4 (2 miles north of the Ellendale area) and Exit 40: US 14 (near Owatonna). The roadway is reduced to one lane due to road construction work and due to bridge construction work. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 11'0". Until Saturday, at about 8:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT. Between North Grove Street and South Minnesota Street (near Redwood Falls). Road construction work is in progress. There are alternating lane closures. The exit ramp is closed. Water main work is in progress. The road is being repaved. Look out for flaggers. Short delays are possible. Until November 10, 2018 at about 9:00PM CDT.
MN 19: Winthrop
I-494: I-494 @ Minnetonka Blvd.
US 14: Waseca
US 169: Henderson
US 169: St. Peter
MN 7: New Germany
US 169: Mankato
I-494: Maple Grove
MN 7: Silver Lake
I-90: Blue Earth
US 14: Byron
US 71: Jeffers
MN 30: Dovray
I-35: Hope
MN 23: Hanley Falls
US 71: Morton
I-35E: Cayuga
US 61: Red Wing
US 52: Cannon Falls
US 63: Stewartville
MN 25: Mayer
I-35: Twin Lakes
MN 7: Clara City
MN 60: Madelia
US 14: Waseca
I-35E: Little Canada
I-90: Lakefield
MN 19: New Prague
I-35: Little Chicago
I-90: Dexter
I-35W: Minnesota River
I-90: Eyota
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing